A smooth temporary fence installation starts with accurate project information. The supplier needs the location, approximate quantity, intended use, schedule and details about site access.
Before delivery
Confirm the perimeter, gate locations, surface conditions and any screening or bracing requirements. Identify the on-site contact and make sure the delivery vehicle can reach the unloading area.
During setup
Panels, bases and connectors are positioned according to the agreed layout. Gates and stability measures are added where required. The site contact should review access points before the crew leaves.
During and after the project
Report damage or requested layout changes promptly. Before removal, clear stored materials and equipment away from the fence line and confirm the pickup window with the supplier.